New bell concert

Place

Brescia

Customer

Parrocchia Cristo Re'

Surface

752 MQ

Chronology

2022

Perfoirmance

Architectural design and structural design, coordination in the design and execution phase, construction management, accounting, testing

Description

To restore the bell concert of the Church of Cristo Re, now stopped for more than a year, it is foreseen to be able to modify the bell concert to make it in tune and cause it to disturb the neighborhood less. It is foreseen the realization of a new concert using the three historic bells of 1841 SI, E SOL # and replace the two major bells of the most recent manufacture (1949) of shades Mi and Fa # with others n. 3 smaller bells, of shades sol, do, re. At the 1st bell level we would have n. 5 bells (sol, la, si, do, sol #) and at the 2nd level bell the bell re. The historical bell sol # will be beaten like a hammer for dead ringing. The new project will have a lower weight than the existing one.

The project house consists of a single floor above ground which includes: a living room of about 31 square meters, a kitchen of about 24 square meters, an atrium for the sleeping area of about 8 square meters, three bedrooms with two bathrooms with a total net area of approximately 80 square meters, an atrium for service environments, a laundry room / thermal power plant, a warehouse with a total net area of approximately 24 square meters, a garage of approximately 37 square meters as well as a porch of approximately 62 square meters. The new building intended for the residence of the agricultural entrepreneur will have the main dimensions in plan equal to 13.70 x 20 meters with a gutter height of 3.30 meters, in addition to the portico on the north side having dimensions equal to 4.35 x 14 meters.