Creation of a new swimming pool

Place

Castel Mella (BS)

Customer

Privato

Surface

1500 MQ circa

Chronology

2022

Perfromance

Participation in tenders for obtaining incentives, architectural design, safety coordination in the design and execution phase, construction management, accounting, practices for networking.

Description

The object of the intervention is the construction of an underground prefabricated swimming pool of 7.00x3.50m, with a height of 1.40 m. This will be made on a 20cm reinforced concrete stalls. The pool cockpit with a size of 1.80 x 1.20m with a height of 1.17m will also be built. This will be buried near the pool.