
Creation of a new swimming pool
Place
Castel Mella (BS)
Customer
Privato
Surface
520 MQ
Chronology
2022
Perfomance
Architectural design, construction management, safety (CSP-CSE)
Description
The object of the intervention is the construction of an underground prefabricated swimming pool of 7.00x3.50m, with a height of 1.40 m. This will be made on a 20cm reinforced concrete stalls. The pool cockpit with a size of 1.80 x 1.20m with a height of 1.17m will also be built. This will be buried near the pool.