Restoration and structural consolidation of the Church of the Holy Trinity

Location

Rovato (Brescia, Italy)

Client

Parish of the Sacred Heart of Jesus, Rovato (Brescia)

Floor area

400 sq m

Timeline

2019

Services

Architectural and structural design, health and safety coordination (design and construction phases), works accounting, works supervision

Description

The church shows significant cracking on the inner face of the façade. The position and pattern of the cracks indicate that the horizontal thrust of the vaults on the façade, combined with the lack of a roof diaphragm restraining it at the top, has triggered an out-of-plane overturning mechanism of the façade. The design provides for two longitudinal tie rods to counteract this mechanism and reduce the seismic vulnerability of the building. The tie rods will be placed in the roof space at a height of about 14.70 m above the internal floor. In addition to the structural deficiencies, the church suffers from serious damp problems and water infiltration through the timber roof. To deal with rising damp, which has badly damaged the lower part of the perimeter walls, a ventilated cavity will be built along the perimeter of the church; the airflow through its ventilation grilles will allow moisture to escape. Large areas of the internal vaults also show powdering and detachment of plaster and efflorescence caused by damp. The condition of the frescoes will be monitored to assess whether conservation work is needed.